The site has scope for a second-phase expansion to 3,000 cabinets across 12,500 square metres.
Each site is within roughly one kilometre of one another, with the facilities linked by some 2,000 dark fibre pairs in a redundant loop.
Equinix can spin up cross-connections between between sites in 24 hours.
No third-party cabling connects to the customer cabinets within the data halls.